|
|
|
Cable Splicing
The splice after hammering on the fourth tuck
The completed splice ready for service
Cutting the tails to finish the splice
The splice after all tucks are completed and tails cut off
Showing the fully served splice and pulling the tail of the thread inside the serve
The first tuck of the splice is completed
The last stage of the splice showing the half tuck
Beating the splice with an ash mallet to tighten it further.
The second tuck of the splice showing a tail protruding between each wire
Starting to serve the splice with waxed linen thread
The first step of the splice showing the tails soldered and the thimble held in place.
The splice after the third tuck prior to hammering
Threading the first wire of the splice
Pulling the first tuck of the splice tight
|
|
|